Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 29, 2023     43-10 Cabin Cover step 4-5 - (3 hours)       Category: Fuselage
Riveted the scat for the overhead air controller. Riveted the baggage channel to the baggage bulkhead. Adapted the top cover bulkhead backing strip. Checked for interferences. Clecoed the tailcone skins with stiffeners and various supports (Adheres and Air vent controller).
Positioned the top cover and clecoed the backing strips.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.